Overview

The protection and automation for plant solution adopts NCS and ECS to manage all the electrical equipment in the plant, enabling intelligent equipment management and optimized data analysis. It can evaluate the health status of the step-up substation, plant auxiliary power supply, and power generation equipment, promptly detect potential defects in power generation equipment, ensure the stable operation of power generation equipment, and improve the safe and stable operation level of the power generation system.

Features

Integrated System

  • Integration of NCS and ECS for electrical monitoring and maintenance
  • Intensive monitoring of the operation of all electrical equipment in the plant
  • Comprehensive suite of generator-transformer unit protection and substation protection

Flexible Deployment

  • Modular system with plug-and-play functionality
  • The system enables rapid expansion and seamless integration

Fault Analysis

  • Defect detection, proactive warning, emergency response
  • Online equipment analysis and diagnosis

Automatic Inspection

  • Automatic inspection of secondary equipment
  • Automatically generate inspection reports

Benefits

Efficiency

The electrical monitoring systems are seamlessly integrated, breaking the information silos of multiple systems. Unified data modeling is carried out to realize unmanned operation of the step - up substation.

Safety

With comprehensive measures, including permission management and self - diagnosis, the system monitors for abnormalities 24 hours a day to ensure the stable operation of the power plant.

Intelligence

It integrates multiple functions and features an integrated design, which is in line with the development trend and lays a foundation for the digital construction of the power plant.

Operation and Maintenance

The automation level is enhanced. Combining with AI, it realizes automatic inspection, identification, and report generation, reducing costs and workload.

Typical Cases

Indonesia Java 7 2×1050MW Coal-Fired Power Plant Project

The 2×1050MW Coal-fired Power Generation Project of Java 7 in Indonesia is a flagship energy project under China's Belt and Road Initiative. It is China's first IPP Coal-fired power project with a capacity of one million kilowatts exported overseas, and also the first ultra-supercritical coal-fired power generation project with a capacity of one million kilowatts in Indonesia. SIFANG provided Electrical Control System (ECS), Network Control System (NCS), protection relays of generator-transformer unit, and protection relays of 500kV step-up substation for this project. The project implementation team has been highly appraised by the general contractor and recognized by the owner.